Keep one tracker with a row per hire, an owner and due date per item, and the I-9, W-4 and state reporting deadlines anchored to the hire date.

Smalt AI team ·

Use one tracker with one row per new hire. Give every item an owner, a due date counted from the hire date and a status, add an equipment record for each device and an I-9 destroy-after date, and have the manager confirm nothing is outstanding by the end of week one.

The deadlines below are US federal rules, not legal advice. Other countries have different rules, and some US states add their own.

Build the tracker and the deadline table

Build one tracker, one row per hire

A spreadsheet is enough. Put each hire on a row, or give each hire a copy of the same checklist, so a missing item shows as an empty cell. The columns that matter:

  • Item (for example “I-9 Section 1”, “laptop issued”, “W-4 received”)
  • Owner: HR, IT, the manager, or the hire
  • Due date
  • Status: not started, in progress, done, blocked
  • Completed date

The owner column turns a checklist into practice, because each item has exactly one person expected to close it.

In this post, the hire date is the first day the person starts work for pay. The 3-business-day and 20-day clocks both count from it. Enter every due date when the offer is accepted, so nobody has to calculate them later.

MilestoneDeadlineSourceDefault owner
Offer accepted, pre-start paperwork (offer letter, bank details, equipment preferences)After acceptance, before day one. Do not collect I-9 documents before acceptance.Recommended practice, not a legal deadlineHR
I-9 Section 1By the hire dateUSCISNew hire
W-4At hireIRS Publication 15 (2026)New hire, requested by HR
I-9 Section 2Within 3 business days of the hire dateUSCISHR or manager
State new-hire reportFederal limit of 20 days from hire; states may set shorter limits, so check yoursHHS Office of Child Support ServicesHR or payroll
I-9 destroy-after dateSet at hire (see below)USCISHR

Two details from the sources. If the person will work fewer than 3 business days, both I-9 sections must be complete at the time of hire. For the state report, Publication 15 treats a “new employee” as someone who hasn’t worked for you before, or who was separated for 60 or more consecutive days.

Worked example (illustrative, not a real hire). A new hire starts Monday, March 1, 2027. Section 1 is due that day. Section 2 is due Thursday, March 4, which matches the Monday-to-Thursday example USCIS gives. The federal 20-day limit for the state report falls on Sunday, March 21, so enter Friday, March 19 as the working due date and confirm your state’s rule.

For remote hires, someone still has to complete the Section 2 document examination within the same 3 business days. This page does not say how to do that remotely, so confirm the permitted methods in current USCIS guidance before the start date.

Record every piece of equipment

No government rule dictates an equipment record, so this part is recommended practice. For each item, log the asset ID or serial number, the date issued, who issued it, and a return date or “on departure” if none is set. Keep it in the same tracker so IT’s row and HR’s row sit side by side.

The CIS Controls list keeping an inventory of enterprise assets as a baseline security control. A per-hire equipment record is a small version of that inventory, and it makes offboarding a lookup instead of a hunt.

Set the I-9 destroy-after date

USCIS guidance on retaining Form I-9 says to keep the form for 3 years after the first day of employment, or 1 year after employment ends, whichever is later. Enter the 3-year date when Section 2 is complete (March 1, 2030 in the example). When the person leaves, compare it with one year after their last day and keep the later date.

You must be able to produce the form within 3 business days of an inspection request. Do not mail I-9s to USCIS or ICE.

Close it out with a manager check

At the end of the first week, the manager opens the row and confirms nothing is outstanding. Anything blocked gets a named owner and a new date. A row only counts as finished when every status reads done and the retention date is set.

Doing it with an AI coworker

Smalt can build the tracker for you from the onboarding checklist you already keep in Notion and your hiring sheet in Google Sheets. Ask it to make one row per hire with the owner and due-date columns above, counting dates from each start date.

You can also ask it to create tasks with an owner and due date in Jira, Asana or Linear, one per checklist item. Tasks are created directly, so they are not held for your approval.

For nudges, ask it to draft reminder emails or Slack messages to owners with overdue items. Those wait for you to send, edit or discard them. It does not file forms or connect to government systems, so the I-9, W-4 and state report still go through your own process.

What to check before you rely on it

The dates in the table are federal defaults. State reporting limits can be shorter than 20 days, other countries have their own paperwork and timing, and your employer type may add requirements, so confirm each date with your state agency or counsel. Check any date a tool or formula produces too: business-day counts around holidays are easy to get wrong, and a spreadsheet only shows that Section 2 was marked done, not that the documents were examined correctly. Whoever reviews them should be trained on the form.

Keep sensitive data out of the tracker. Store the status and date, not the Social Security number or document copies, and limit who can see the sheet.

For equipment, a laptop reassigned without a log entry leaves the row naming the wrong person. Make IT the only editor of equipment rows and compare them with actual inventory once a quarter. For remote hires, put the carrier tracking number in the row and set the due date a few days before the start date, so a late delivery shows up while there is still time to act.

Smalt is an AI coworker that takes jobs like this end to end and hands back the finished file.